Bengaluru rains I Storm Water Drain I North Bengaluru I
Bengaluru rains I Storm Water Drain I North Bengaluru I
The BBMP officials told they have removed 15-20 encroachments from stormwater drains in the last 15 days
According to principal engineer and incharge of the Storm Water Drain department in BBMP, BS Prahallad, Chief Commissioner Tushar Girinath
shop licence renewal online 8) As per BWSSB Act Section 72 and relevant regulations, Rain Water Harvesting is storm water drain, low lying area 12) The orders of the National Green
rummy points table storm water drains while bypassing NGT's guidelines of storm water drain buffer regions; Concretisation of storm water drains
Regular
price
171.00 ₹ INR
Regular
price
171.00 ₹ INR
Sale
price
171.00 ₹ INR
Unit price
/
per